Weapons Systems Over-Budget
Friday, August 29th, 2008Excerpt: (Read the full post »)
An article in the Washington Post quotes a GAO for weapons systems being over-budget is insufficient rigor in the acquisition process. Including simulatable models (virtual prototypes) as deliverables in the early stages of a program is proposed as a mitigator.
